<?xml version="1.0" encoding="UTF-8"?>
<?xml-model type="application/xml-dtd" href="http://jats.nlm.nih.gov/publishing/1.1d3/JATS-journalpublishing1.dtd"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Journal Publishing DTD v1.1d3 20150301//EN" "http://jats.nlm.nih.gov/publishing/1.1d3/JATS-journalpublishing1.dtd">
<article xmlns:ali="http://www.niso.org/schemas/ali/1.0" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:mml="http://www.w3.org/1998/Math/MathML" dtd-version="1.1d3" specific-use="Marcalyc 1.2" article-type="research-article" xml:lang="es">
<front>
<journal-meta>
<journal-id journal-id-type="redalyc">624</journal-id>
<journal-title-group>
<journal-title specific-use="original" xml:lang="es">FIGEMPA: Investigación y Desarrollo</journal-title>
</journal-title-group>
<issn pub-type="ppub">1390-7042</issn>
<issn pub-type="epub">2602-8484</issn>
<publisher>
<publisher-name>Universidad Central del Ecuador</publisher-name>
<publisher-loc>
<country>Ecuador</country>
<email>revista.figempa@uce.edu.ec</email>
</publisher-loc>
</publisher>
</journal-meta>
<article-meta>
<article-id pub-id-type="art-access-id" specific-use="redalyc">6243939001</article-id>
<article-id pub-id-type="doi">https://doi.org/10.29166/revfig.v1i1.50</article-id>
<article-categories>
<subj-group subj-group-type="heading">
<subject>ARTÍCULOS</subject>
</subj-group>
</article-categories>
<title-group>
<article-title xml:lang="es">Evaluación del impacto que tendrá en la economía del Ecuador el inicio de la producción de los depósitos de materiales metálicos</article-title>
<trans-title-group>
<trans-title xml:lang="en">Evaluation of the impact that will have on the economy of the Ecuador the start of production of the deposits of metallic materials</trans-title>
</trans-title-group>
</title-group>
<contrib-group>
<contrib contrib-type="author" corresp="yes">
<name name-style="western">
<surname>Soria Venegas</surname>
<given-names>Francisco</given-names>
</name>
<xref ref-type="corresp" rid="corresp1"/>
<xref ref-type="aff" rid="aff1"/>
<email>fsoria@curimining.com.ec</email>
</contrib>
<contrib contrib-type="author" corresp="no">
<name name-style="western">
<surname>Aguila Guevara</surname>
<given-names>Carlos</given-names>
</name>
<xref ref-type="aff" rid="aff2"/>
<email>caguilaguev@yahoo.com</email>
</contrib>
<contrib contrib-type="author" corresp="no">
<contrib-id contrib-id-type="orcid">https://orcid.org/0000-0001-6223-0141</contrib-id>
<name name-style="western">
<surname>Palacios Cabrera</surname>
<given-names>Teresa Alejandra</given-names>
</name>
<xref ref-type="aff" rid="aff3"/>
<email>tapalacios@uce.edu.ec</email>
</contrib>
</contrib-group>
<aff id="aff1">
<institution content-type="original">Ingeniero
en geología. Consultor independiente 

Durante
sus 26 años en exploración minera en Sudamérica, para diferentes tipos de
depósitos minerales ha trabajado en el sector privado desempeñándose como
geólogo de exploración en los proyectos Curipamba,
Río Blanco y Gaby, adicionalmente ha trabajado en otros proyectos
internacionales en países como Colombia, Perú, Chile y Argentina</institution>
<institution content-type="orgname">Consultor independiente. Quito</institution>
<country country="EC">Ecuador</country>
</aff>
<aff id="aff2">
<institution content-type="original">Ingeniero
en geología de la Universidad Central del Ecuador.  

Coordinador
general técnico del Instituto Nacional de Investigación Geológico Minero
Metalúrgico. Se desempeña como Coordinador General Técnico del Instituto
Nacional de Investigación Geológico Minero Metalúrgico. Durante sus 31 años de trayectoria
en el área de exploración de minerales metálicos con énfasis en mapeo a detalle
y programas de exploración avanzada para diferentes tipos de depósitos
minerales ha trabajado en el sector privado desempeñándose como geólogo de
exploración en los proyectos Curipamba, Río Blanco y
Gaby.</institution>
<institution content-type="orgname">Instituto Nacional de Investigación Geológico Minero Metalúrgico. Quito</institution>
<country country="EC">Ecuador</country>
</aff>
<aff id="aff3">
<institution content-type="original">Ingeniera
química de la Universidad Central del Ecuador. Docente FIGEMPA. Se desempeña
como docente de la Carrera de Ingeniería Ambiental de la FIGEMPA. Durante sus
16 años de experiencia profesional ha trabajado como consultora en varios
proyectos y en el Ministerio del Ambiente.</institution>
<institution content-type="orgname">Universidad Central del Ecuador. Quito</institution>
<country country="EC">Ecuador</country>
</aff>
<author-notes>
<corresp id="corresp1">
<email> 

fsoria@curimining.com.ec</email>
</corresp>
</author-notes>
<pub-date pub-type="epub-ppub">
<season>Enero-Junio</season>
<year>2017</year>
</pub-date>
<volume>3</volume>
<issue>1</issue>
<fpage>6</fpage>
<lpage>14</lpage>
<history>
<date date-type="received" publication-format="dd mes yyyy">
<day>30</day>
<month>03</month>
<year>2017</year>
</date>
<date date-type="accepted" publication-format="dd mes yyyy">
<day>30</day>
<month>05</month>
<year>2017</year>
</date>
</history>
<permissions>
<ali:free_to_read/>
<license xlink:href="https://creativecommons.org/licenses/by/4.0/">
<ali:license_ref>https://creativecommons.org/licenses/by/4.0/</ali:license_ref>
<license-p>Esta obra está bajo una Licencia Creative Commons Atribución 4.0 Internacional.</license-p>
</license>
</permissions>
<abstract xml:lang="es">
<title>Resumen</title>
<p> El estudio se basa en el marco legal y tributario de minería, estudios económicos, para evaluar el impacto económico que implica el iniciar la explotación de los principales yacimientos minerales metálicos de El Domo, Fruta Del Norte, Loma Larga y Mirador en Ecuador. Además, estima el potencial de la industria minera en Ecuador sobre la base de la información certificada de los informes técnicos NI 43-101. En territorio ecuatoriano, los Andes poseen condiciones geológicas favorables para la formación de depósitos minerales metálicos de clase mundial. Estas características fisiológicas y geológicas son similares a las de todo el cinturón andino sudamericano donde países vecinos como Colombia, Perú, Bolivia, Argentina y Chile han desarrollado con éxito su industria minera. La metodología aplicada para evaluar los yacimientos minerales utiliza variables cualitativas y cuantitativas aceptadas globalmente y también ofrece recomendaciones para cambios en el régimen legal. Bajo el régimen jurídico vigente existen tres categorías para la explotación de yacimientos minerales: Operaciones mineras de pequeña escala, hasta 300 toneladas / día en operaciones subterráneas; Operaciones mineras de medina escala, hasta 1.000 ton / día en operaciones subterráneas y hasta 2000 ton / día en operaciones a cielo abierto, y Operaciones mineras de gran escala, con una producción superior a los límites establecidos en los ya mencionados. Como resultado del análisis, se recomienda aumentar los límites de los volúmenes de producción para las tres categorías, de manera que el desarrollo y la producción minera sean más atractivos para los inversionistas y compañías mineras de todos los tamaños. Sobre la base del flujo de caja de los proyectos analizados, la carga fiscal varía de 38% a 45%. Sin embargo, el Ministerio de Minería y la consultora Wood Mackenzie concluyen que la carga tributaria es cercana al 27%. De acuerdo con la documentación internacional disponible de la NI 43-101, Ecuador tiene 8.5 M oz. de oro y 19,2 M oz. de plata en Reservas y 23.8 M oz. de oro y 168,3 M oz. de plata en Recursos Reservas de 47 millones de libras de cobre; 41.334 millones de libras de cobre como recurso y 865 millones de libras de molibdeno como recurso. La inversión inicial (CAPEX) para los 4 proyectos sumará USD 2.123 M, en la fase de construcción de la mina, entre los años 2017 y 2021. La demanda de empleo directo en el mismo período será de 4.140 empleados, de los cuales el 30% corresponderá al personal técnico y administrativo y el 70% a los operadores y trabajadores de campo. Preferiblemente, la fuerza de trabajo será local al área del proyecto. El empleo indirecto se asignará a nivel regional y nacional. Según los estudios, los métodos de explotación minera que se utilizarán se definen de la siguiente manera: en El Domo una combinación de minería a cielo abierto y subterránea, en Fruta Del Norte y Loma Larga como subsuelo, y Mirador como pozo abierto. La estimación del Ingreso Neto de Fundición (NSR) combinada para los 4 proyectos será de USD 11.410 millones, en 17 años de producción. Los beneficios económicos estimados para el estado agregando los 4 proyectos, incluyendo el impuesto sobre la renta + regalías + utilidades + IVA, en 17 años de operaciones de las minas serán USD 2.063 millones. </p>
</abstract>
<kwd-group xml:lang="es">
<title>Palabras clave</title>
<kwd>legislación minero y fiscal</kwd>
<kwd>depósitos minerales metálicos</kwd>
<kwd>industria minera</kwd>
<kwd>análisis económico</kwd>
<kwd>condiciones geológicas fisiográficas</kwd>
</kwd-group>
<kwd-group xml:lang="en">
<title>Keywords</title>
<kwd>mining and tax legislation</kwd>
<kwd>metallic mineral deposits</kwd>
<kwd>mining industry</kwd>
<kwd>economic analysis</kwd>
<kwd>geological physiographic conditions</kwd>
</kwd-group>
<counts>
<fig-count count="4"/>
<table-count count="4"/>
<equation-count count="0"/>
<ref-count count="26"/>
</counts>
<custom-meta-group>
<custom-meta>
<meta-name>Cómo citar</meta-name>
<meta-value>Soria Venegas, F., Aguila Guevara, C., &amp; Palacios Cabrera, T. A. (2017). Evaluación del impacto que tendrá en la economía del Ecuador el inicio de la producción de los depósitos de materiales metálicos. <italic>FIGEMPA: Investigación Y Desarrollo</italic>, 3(1), 6–14. https://doi.org/10.29166/revfig.v1i1.50</meta-value>
</custom-meta>
</custom-meta-group>
</article-meta>
</front>
<body>
<sec sec-type="intro">
<title>
<bold>INTRODUCCIÓN</bold>
</title>
<p> Los Andes en territorio ecuatoriano, presentan condiciones geológico – estructurales que favorecen la formación de depósitos minerales metálicos de clase mundial. Estas características, fisiográficas-geológicas tienen similitud en el cinturón andino sudamericano, en cuyos países ha sido posible el desarrollo de la industria minera como es el caso de Colombia, Perú, Bolivia, Argentina y Chile. </p>
<p> Algunos depósitos mineros en nuestro país ya han sido evaluados y hasta la fecha no inician la etapa de explotación debido a varios factores, tales como:</p>
<p>
<list list-type="bullet">
<list-item>
<p>Retraso en los permisos ambientales para la fase de producción.</p>
</list-item>
<list-item>
<p> Procesos de firma de los contratos de
explotación.</p>
</list-item>
<list-item>
<p> Reformas a la Normativa Legal y
Tributaria.</p>
</list-item>
<list-item>
<p> Impuestos altos comparados con los de
otros países mineros de la región.</p>
</list-item>
<list-item>
<p>El país es muy incipiente en la
industria minera.</p>
</list-item>
<list-item>
<p> Falta de aprovechamiento efectivo,
adecuado y oportuno del potencial geológico minero del país.</p>
</list-item>
<list-item>
<p> La minería artesanal y pequeña que
existe en el país ha incidido negativamente en la imagen y percepción de la
industria minera.</p>
</list-item>
<list-item>
<p> Falta de investigación en la exploración
de minerales metálicos, debido a la suspensión de otorgamiento de concesiones
mineras.</p>
</list-item>
<list-item>
<p> Falta de servicios mineros.</p>
</list-item>
</list>
</p>
<p> Con estos antecedentes, planteamos la necesidad de hacer un análisis económico de los principales depósitos de minerales metálicos, que ya disponen de investigaciones de exploración avanzados y que estarían listos para entrar en la fase de producción. </p>
<p> La normativa legal ecuatoriana vigente estipula tres categorías de explotación de minería metálica, que son: Pequeña Minería hasta 300 t/día en minería subterránea, 1000t/ día a cielo abierto; para Mediana Minería hasta 1000 t/día en subterráneo y 2000 t/día a cielo abierto; y Gran Minería sobre esos límites. </p>
<p> Según documentos disponibles e informes con estándar canadiense NI 43-101, para el Ecuador se tienen: Reservas de 8,5 millones de onzas de oro y 19,2 millones de onzas de plata; Recursos de 23,8 millones de onzas de oro y 168,3 millones de onzas de plata. Reservas de 47 millones de libras de cobre; 41,334 millones de libras de cobre como recurso y 865 millones de libras de molibdeno como recurso.</p>
</sec>
<sec sec-type="materials|methods">
<title>
<bold>MATERIAL Y MÉTODOS</bold>
</title>
<p> Se consideró información geológico – minera, a partir de los medios de difusión pública de las empresas propietarias de los derechos mineros, medios nacionales e internacionales, seguido de la Clasificación de información histórica por tamaño y tipo de depósito mineral; simultáneamente se efectuó el Diagnóstico de la aplicación de la normativa tributaria; y, la Evaluación económica-social de los principales depósitos mineros, partiendo de la disponibilidad de los estudios actualizados en sus fases de Pre-factibilidad y factibilidad de los proyectos. </p>
<p> La metodología utilizada consiste en la sistematización y evaluación de los depósitos minerales, aplicando de manera integral las variables cualitativas y cuantitativas mundialmente aceptadas y adaptadas a la realidad nacional, como se expone a continuación:</p>
<p>
<list list-type="bullet">
<list-item>
<p>Obtención de la información geológico minera a partir de los medios de difusión pública de las empresas propietarias de los derechos mineros, medios nacionales e internacionales.</p>
</list-item>
<list-item>
<p>Clasificación de la información histórica
por tamaño y tipo de depósito.</p>
</list-item>
<list-item>
<p>Diagnóstico de la aplicación de la
normativa tributaria.</p>
</list-item>
<list-item>
<p> Evaluación económica de los principales
depósitos mineros.</p>
</list-item>
<list-item>
<p> Evaluación del impacto social y laboral.</p>
</list-item>
</list>
</p>
<sec sec-type="materials|methods">
<title>
<bold>Técnicas de análisis</bold>
</title>
<p>Las técnicas de análisis pueden
agruparse en geológicas mineras, económicas financieras, legales, políticas y
socio ambientales; las mismas que son parte integral de la evaluación de los
proyectos.</p>
<p>
<list list-type="bullet">
<list-item>
<p>Técnicas de evaluación de los depósitos.</p>
</list-item>
<list-item>
<p> Estudios: Conceptual, pre-factibilidad y factibilidad de los proyectos.</p>
</list-item>
<list-item>
<p>Fuentes de financiamiento.</p>
</list-item>
<list-item>
<p>Aplicación de herramienta tecnológica.</p>
</list-item>
</list>
</p>
</sec>
<sec sec-type="materials|methods">
<title>
<bold>Características generales</bold>
</title>
<p>Los costos y gastos imputables que se
hayan generado para obtener, mantener y mejorar la empresa, son deducibles del
impuesto a ganancias extraordinarias. A continuación, se presenta la <xref ref-type="table" rid="gt1">tabla 1</xref> que resume los impuestos que tienen incidencia directa en la carga tributaria.</p>
<p>
<table-wrap id="gt1">
<label>Tabla 1</label>
<caption>
<title>
<bold>Impuestos en Ecuador</bold>
</title>
</caption>
<alt-text>Tabla 1 Impuestos en Ecuador</alt-text>
<alternatives>
<graphic xlink:href="https://revistadigital.uce.edu.ec/index.php/RevFIG/article/download/50/5500/25615" position="anchor" orientation="portrait"/>
<table style="border-collapse:  collapse;border:none;    " id="gt2-526564616c7963">
<tbody>
<tr style="height:1.0pt">
<td style="width:212.35pt;border:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;height:1.0pt;text-align:center;">
<bold>
  Tipo
  de Impuesto
  </bold>
</td>
<td style="width:212.35pt;border:solid black 1.0pt;border-left:   none;   padding:0cm 0cm 0cm 0cm;height:1.0pt;text-align:center;">
<bold>
  Porcentajes
  </bold>
</td>
</tr>
<tr style="height:1.0pt;">
<td style="width:212.35pt;border:solid black 1.0pt;border-top:none;      padding:0cm 0cm 0cm 0cm;height:1.0pt;text-align:center;">
  I<bold>MPUESTOS EN ECUADOR
  </bold>
</td>
<td style="border:none;border-bottom:solid black 1.0pt"/>
</tr>
<tr style="height:1.0pt">
<td style="width:212.35pt;border:solid black 1.0pt;border-top:none;      padding:0cm 0cm 0cm 0cm;height:1.0pt">
  Impuesto a la Renta – IR
  </td>
<td style="width:212.35pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:1.0pt">
  –         
  22% (12%, si el
  beneficio se reinvierte en el país).
  –         
  25%
  si las empresas extranjeras tienen su oficina principal en paraísos fiscales.
  </td>
</tr>
<tr style="height:1.0pt">
<td style="width:212.35pt;border:solid black 1.0pt;border-top:none;      padding:0cm 0cm 0cm 0cm;height:1.0pt">
  Impuesto al Valor Agregado – IVA
  </td>
<td style="width:212.35pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:1.0pt">
  0% y 12% (temporalmente 14% entre 2016 hasta 2017),
  dependiendo del tipo de bien o servicio
  </td>
</tr>
<tr style="height:1.0pt">
<td style="width:212.35pt;border:solid black 1.0pt;border-top:none;      padding:0cm 0cm 0cm 0cm;height:1.0pt">
  Impuesto de Consumo Especial – ICE
  </td>
<td style="width:212.35pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:1.0pt">
  Para bienes de lujo, de acuerdo a una tabla de impuestos
  </td>
</tr>
<tr style="height:1.0pt">
<td style="width:212.35pt;border:solid black 1.0pt;border-top:none;      padding:0cm 0cm 0cm 0cm;height:1.0pt">
  Sobretasa Arancelaria, Impuesto Temporal - Salvaguardia
  </td>
<td style="width:212.35pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:1.0pt">
  Del 5% a 45%, para ciertos bienes de consumo, capital y materia prima
  </td>
</tr>
<tr style="height:1.0pt;">
<td style="width:212.35pt;border:solid black 1.0pt;border-top:none;      padding:0cm 0cm 0cm 0cm;height:1.0pt;text-align:center;">
<bold>
  IMPUESTOS A LA ACTIVIDAD MINERA
  </bold>
</td>
<td style="border:none;border-bottom:solid black 1.0pt"/>
</tr>
<tr style="height:1.0pt">
<td style="width:212.35pt;border:solid black 1.0pt;border-top:none;      padding:0cm 0cm 0cm 0cm;height:1.0pt">
  Regalías
  </td>
<td style="width:212.35pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:1.0pt">
  –         
  Gran Minería: del 5% al 
  8%
  –         
  Mediana Minería: 4%
  –         
  Pequeña Minería: 3%
  –         
  Minería Artesanal: 0%
  </td>
</tr>
<tr style="height:1.0pt">
<td style="width:212.35pt;border:solid black 1.0pt;border-top:none;      padding:0cm 0cm 0cm 0cm;height:1.0pt">
  Impuesto de Utilidades a los Trabajadores
  </td>
<td style="width:212.35pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:1.0pt">
  15% de las ganancias, descontado los gastos de
  operación e impuestos:
   Gran Minería: 
  ·         
  3%
  para los trabajadores y 12% para el Estado.
  Mediana Minería: 
  ·         
  5%
  para los trabajadores y 10% para el Estado.
  Pequeña Minería: 
  ·         
  10%
  para los trabajadores y 5% para el Estado.
  </td>
</tr>
<tr style="height:1.0pt">
<td style="width:212.35pt;border:solid black 1.0pt;border-top:none;      padding:0cm 0cm 0cm 0cm;height:1.0pt">
  Impuesto sobre Ganancias Extraordinarias (solo a la Gran Minería)
  </td>
<td style="width:212.35pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:1.0pt">
  70% para el Estado y 30% para el concesionario que lo explota.
  </td>
</tr>
<tr style="height:1.0pt">
<td style="width:212.35pt;border:solid black 1.0pt;border-top:none;      padding:0cm 0cm 0cm 0cm;height:1.0pt">
  Ajuste Soberano (para cumplir con el Art. 408 de la constitución)
  </td>
<td style="width:212.35pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:1.0pt">
  Si el Estado ha recibido beneficios en un monto inferior a los del
  titular que los explota, se procederá al cálculo y pago del Ajuste Soberano.
  Dicho impuesto se pagará después de la recuperación de la inversión
  </td>
</tr>
<tr style="height:1.0pt">
<td style="width:212.35pt;border:solid black 1.0pt;border-top:none;      padding:0cm 0cm 0cm 0cm;height:1.0pt">
  Impuesto a la Enajenación de Acciones.
  </td>
<td style="width:212.35pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:1.0pt">
  22% de las ganancias por apreciación del capital, en circunstancias
  especificas
  </td>
</tr>
<tr style="height:1.0pt">
<td style="width:212.35pt;border:solid black 1.0pt;border-top:none;      padding:0cm 0cm 0cm 0cm;height:1.0pt">
  Patente
  de conservación
  </td>
<td style="width:212.35pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:1.0pt">
  –         
  Para Mediana y
  Gran Minería: Exploración inicial se paga el 2.5% del Salario Básico
  Unificado por hectárea; Exploración avanzada y evaluación económica el 5% del
  SBU por hectárea; y para la etapa de explotación el 10% del SBU por hectárea.
  –         
  Para Pequeña
  Minería: Fases simultaneas de exploración y explotación, el 2% del SBU por
  hectárea
  </td>
</tr>
</tbody>
</table>
</alternatives>
</table-wrap>
</p>
<p> Se compararon las cargas tributarias de los países mineros, de los cuales en los últimos años (2012, 2014, 2016) el gobierno participó con el 52%, 37% y 27% respectivamente. Esta carga tributaria, respecto de la región continúa siendo alta, por lo que el Ecuador se torna poco atractivo para el ingreso de capital extranjero, y los inversores locales no tienen la cultura para invertir en actividades de alto riesgo y largo plazo como lo es la minería; esto ha dado lugar una evolución de reformas a la Ley Minera y Reformas Tributarias, con el propósito de incentivar a la inversión privada. </p>
<p> Se determinó que la aplicación del cálculo de las regalías debe estar basado en el ingreso neto (NSR), sin embargo, mientras en pequeña y mediana minería, los concesionarios pueden deducir el precio de fundición, refinamiento y transporte; en gran minería sólo se pueden deducir estos dos últimos.</p>
</sec>
</sec>
<sec sec-type="results">
<title>
<bold>RESULTADOS</bold>
</title>
<p>Se obtuvieron resultados en cuatro
aspectos importantes: sugerencias al Marco Legal-Tributario, la exploración
minera en Ecuador, la disponibilidad de recursos y reservas a la fecha; y los
beneficios a nivel nacional a partir del respectivo análisis económico de los
proyectos en procesos de factibilidad y explotación.</p>
<sec sec-type="results">
<title>
<bold>Recursos y reservas de los principales proyectos mineros metálicos</bold>
</title>
<p> Después de hacer un análisis de la información disponible de los principales proyectos mineros (<xref ref-type="fig" rid="gf1">figura 1</xref>)  y tomando como base los informes con estándar canadiense NI 43-101, de la Bolsa de Valores de Toronto principalmente; se realizó un resumen del potencial minero en oro y plata; y un resumen de los recursos y reservas de todos los principales proyectos del Ecuador (<xref ref-type="fig" rid="gf2">figura 2</xref>), tanto para oro-plata (<xref ref-type="fig" rid="gf3">figura 2a</xref>) y cobre-molibdeno (<xref ref-type="fig" rid="gf4">figura 2b</xref> y <xref ref-type="table" rid="gt2">tabla 2</xref>), expuestos en las tablas. Constituyendo así, un potencial real de la disponibilidad a la fecha de recursos y reservas con que cuenta el país. </p>
<p>
<fig id="gf1">
<label>Figura 1</label>
<caption>
<title>
<bold>Resumen de Reservas &amp; Recursos de Oro y
Plata de los principales Proyectos Mineros</bold>
</title>
</caption>
<alt-text>Figura 1 Resumen de Reservas &amp; Recursos de Oro y
Plata de los principales Proyectos Mineros</alt-text>
<graphic xlink:href="https://revistadigital.uce.edu.ec/index.php/RevFIG/article/download/50/5500/25611" position="anchor" orientation="portrait"/>
</fig>
</p>
<p>
<fig id="gf2">
<label>Figura 2</label>
<caption>
<title>
<bold>Mapa de ubicación de proyectos mineros
metálicos</bold>
</title>
</caption>
<alt-text>Figura 2 Mapa de ubicación de proyectos mineros
metálicos</alt-text>
<graphic xlink:href="https://revistadigital.uce.edu.ec/index.php/RevFIG/article/download/50/5500/25612" position="anchor" orientation="portrait"/>
<attrib>
<xref ref-type="bibr" rid="redalyc_6243939001_ref13">INIGEM, 2016</xref>
</attrib>
</fig>
</p>
<p>
<fig id="gf3">
<label>Figura 2a</label>
<caption>
<title>
<bold>Reservas y recursos de oro y plata </bold>
</title>
</caption>
<alt-text>Figura 2a Reservas y recursos de oro y plata </alt-text>
<graphic xlink:href="https://revistadigital.uce.edu.ec/index.php/RevFIG/article/download/50/5500/25613" position="anchor" orientation="portrait"/>
</fig>
</p>
<p>
<fig id="gf4">
<label>Figura 2b</label>
<caption>
<title>
<bold>Reservas y recursos de Cobre y Molibdeno</bold>
</title>
</caption>
<alt-text>Figura 2b Reservas y recursos de Cobre y Molibdeno</alt-text>
<graphic xlink:href="https://revistadigital.uce.edu.ec/index.php/RevFIG/article/download/50/5500/25614" position="anchor" orientation="portrait"/>
</fig>
</p>
<p>
<table-wrap id="gt2">
<label>Tabla 2</label>
<caption>
<title>
<bold>Reservas y recursos mineros de cobre
y molibdeno en el Ecuador</bold>
</title>
</caption>
<alt-text>Tabla 2 Reservas y recursos mineros de cobre
y molibdeno en el Ecuador</alt-text>
<alternatives>
<graphic xlink:href="https://revistadigital.uce.edu.ec/index.php/RevFIG/article/download/50/5500/25616" position="anchor" orientation="portrait"/>
<table style="margin-left:  5.35pt;border-collapse:collapse;border:none;    " id="gt3-526564616c7963">
<tbody>
<tr style="height:31.2pt;">
<td style="width:58.95pt;border:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:31.2pt;text-align:center;">
<bold>METAL
  </bold>
</td>
<td style="width:55.45pt;border:solid black 1.0pt;   border-left:none;   padding:0cm 0cm 0cm 0cm;height:31.2pt;text-align:center;">
<bold>
  RESERVAS
</bold>  (M lb)
  </td>
<td style="width:59.2pt;border:solid black 1.0pt;   border-left:none;   padding:0cm 0cm 0cm 0cm;height:31.2pt;text-align:center;">
<bold>
  RECURSOS
</bold>  (M lb)
  </td>
<td style="width:63.85pt;border:solid black 1.0pt;   border-left:none;   padding:0cm 0cm 0cm 0cm;height:31.2pt;text-align:center;">
<bold>TOTAL </bold>(M lb)
  </td>
</tr>
<tr style="height:15.5pt;">
<td style="width:58.95pt;border:solid black 1.0pt;   border-top:none;   padding:0cm 0cm 0cm 0cm;height:15.5pt;">
  COBRE
  </td>
<td style="width:55.45pt;border-top:none;border-left:   none;border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;      padding:0cm 0cm 0cm 0cm;height:15.5pt;   ">
  47
  </td>
<td style="width:59.2pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:15.5pt;">
  41334
  </td>
<td style="width:63.85pt;border-top:none;border-left:   none;border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;      padding:0cm 0cm 0cm 0cm;height:15.5pt;   ">
  41381
  </td>
</tr>
<tr style="height:16.3pt;">
<td style="width:58.95pt;border:solid black 1.0pt;   border-top:none;   padding:0cm 0cm 0cm 0cm;height:16.3pt;">
  MOLIBDENO
  </td>
<td style="width:55.45pt;border-top:none;border-left:   none;border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;      padding:0cm 0cm 0cm 0cm;height:16.3pt;   ">
  0
  </td>
<td style="width:59.2pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:16.3pt;">
  865
  </td>
<td style="width:63.85pt;border-top:none;border-left:   none;border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;      padding:0cm 0cm 0cm 0cm;height:16.3pt;   ">
  865
  </td>
</tr>
<tr style="height:15.5pt;">
<td style="width:237.45pt;border:solid black 1.0pt;   border-top:none;   padding:0cm 0cm 0cm 0cm;height:15.5pt;" colspan="4">
  NOTE: Reservas y Recursos in-situ, M =
  Millones, Lb = Libras
  </td>
</tr>
</tbody>
</table>
</alternatives>
</table-wrap>
</p>
</sec>
<sec sec-type="results">
<title>
<bold>ANÁLISIS ECONÓMICO</bold>
</title>
<sec sec-type="results">
<title>
<bold>Resultados Económicos Depósito El Domo</bold>
</title>
<p>
<list list-type="bullet">
<list-item>
<p>Flujo de caja acumulado después de
impuestos US$ 205.754,080</p>
</list-item>
<list-item>
<p>Periodo de recuperación de la inversión
2 años</p>
</list-item>
<list-item>
<p> Tasa Interna de Retorno TIR es de 33% </p>
</list-item>
<list-item>
<p>Valor Neto Presente NPV (con tasa de
descuento 7.5%), US$ 107,004,612</p>
</list-item>
<list-item>
<p> Impuesto acumulado para el Estado
Ecuatoriano (14 años vida de la mina) US$ 156,596,197.</p>
</list-item>
</list>
</p>
<p>
<bold> Beneficios para el Ecuador </bold>
</p>
<p> El Estudio Preliminar Económico de El Domo confirma que proporcionará beneficios considerables a Ecuador, a nivel local, provincial y nacional.</p>
<p>
<list list-type="bullet">
<list-item>
<p>Durante la construcción aprox. 400 empleos directos e indirectos y durante la operación aproximadamente 170 empleos directos (30% técnicos y administrativos y 70% obreros y operadores).</p>
</list-item>
<list-item>
<p> Mejora de la infraestructura local y
regional</p>
</list-item>
<list-item>
<p> Continuación de los programas de
inversión en la comunidad, desarrollo de pequeñas empresas y el apoyo del desarrollo cultural existente; y</p>
</list-item>
<list-item>
<p>  Se prevé que el proyecto generé impuestos para el gobierno de US$ 156.596.197, por concepto de regalías, IR, Utilidades e IVA, durante la vida de la mina. </p>
</list-item>
</list>
</p>
</sec>
<sec sec-type="results">
<title>
<bold>Resultados Económicos Depósito Fruta Del
Norte</bold>
</title>
<p>
<list list-type="bullet">
<list-item>
<p>Flujo de caja acumulado después de
impuestos US$ 1,450,000,000.00</p>
</list-item>
<list-item>
<p> Periodo de recuperación de la inversión
4.5 años</p>
</list-item>
<list-item>
<p> Tasa Interna de Retorno IRR, es de
15.7%Valor Neto Presente NPV (con tasa de descuento 5%), US$ 676,000,000.00</p>
</list-item>
<list-item>
<p> Impuesto acumulado para el Estado
Ecuatoriano (13 años vida de la mina) US$ 914,000,000.00</p>
</list-item>
</list>
</p>
<p>
<bold> Beneficios para el Ecuador </bold>
</p>
<p> El Estudio de Factibilidad confirma que FDN proporcionará beneficios considerables a Ecuador, a nivel local, provincial y nacional.</p>
<p>
<list list-type="bullet">
<list-item>
<p>Durante la construcción la empresa
empleará a 2040 personas (1370 empleos directos y 670 empleos de los
contratistas) y durante la operación la empresa empleará 800 personas (70%
obreros y operadores, y 30% especialistas, técnicos y administradores).</p>
</list-item>
<list-item>
<p> Mejora de la infraestructura local y
regional.</p>
</list-item>
<list-item>
<p> Continuación de los programas de
inversión en la comunidad, desarrollo de pequeñas empresas y el apoyo del
desarrollo cultural existente; y</p>
</list-item>
<list-item>
<p>Sobre la base de un precio del oro de
US$ 1,250/onza, se prevé que el proyecto generé impuestos para el gobierno de
US$ 914 millones, por concepto de regalías, IR, Utilidades e IVA, durante la
vida de la mina Regalías anticipadas por US$ 65,000,000.00.</p>
</list-item>
</list>
</p>
</sec>
<sec sec-type="results">
<title>
<bold>Resultados Económicos Depósito Loma
Larga (Quimsacocha)</bold>
</title>
<p>
<list list-type="bullet">
<list-item>
<p> Flujo de caja acumulado después de
impuestos US$ 496,154,700.00.</p>
</list-item>
<list-item>
<p> Periodo de recuperación de la inversión
2.7 años.</p>
</list-item>
<list-item>
<p> Tasa Interna de Retorno IRR es de 26.3%</p>
</list-item>
<list-item>
<p> Valor Neto Presente NPV (con tasa de
descuento 7.5%) US$ 232,400,000.00</p>
</list-item>
<list-item>
<p>Benéfico acumulado para el Estado
Ecuatoriano (12 años vida de la mina) US$ 379,595,300.00</p>
</list-item>
</list>
</p>
<p>
<bold> Beneficios para el Ecuador </bold>
</p>
<p> El Estudio de Pre-Factibilidad confirma que el Depósito Loma Larga proporcionará beneficios considerables a Ecuador, a nivel local, provincial y nacional.</p>
<p>
<list list-type="bullet">
<list-item>
<p>Durante la construcción, aproximadamente
500 empleos (directos de la compañía y los contratistas) y durante la operación
176 empleos directos (99 empleos locales y 77 empleos de personal técnico
administrativo).</p>
</list-item>
<list-item>
<p>Mejora de la infraestructura local y
regional;</p>
</list-item>
<list-item>
<p>Continuación de los programas de inversión
en la comunidad, desarrollo de pequeñas empresas y el apoyo del desarrollo
cultural existente; y</p>
</list-item>
<list-item>
<p> Este proyecto se estima generé impuestos para el gobierno de US$ 379.59 millones; por concepto de regalías, IR, Utilidades e IVA, durante la vida de la mina. </p>
</list-item>
</list>
</p>
</sec>
<sec sec-type="results">
<title>
<bold>Resultados Económicos Depósito Mirador ECSA</bold>
</title>
<p>
<list list-type="bullet">
<list-item>
<p>Flujo de caja acumulado después de
impuestos US$ 755.432.674,00</p>
</list-item>
<list-item>
<p>Periodo de recuperación de la inversión
4 años</p>
</list-item>
<list-item>
<p>Tasa Interna de Retorno IRR es de 17.7%</p>
</list-item>
<list-item>
<p>Valor Neto Presente NPV (con tasa de
descuento 8%) US$ 265,000,000.00</p>
</list-item>
<list-item>
<p> Benéfico acumulado para el Estado
Ecuatoriano (17 años vida de la mina) US$ 612.792.800,00</p>
</list-item>
</list>
</p>
</sec>
<sec sec-type="results">
<title>
<bold>Resumen del análisis económico de los
principales proyectos mineros</bold>
</title>
<p>
<table-wrap id="gt3">
<label>Tabla 3</label>
<caption>
<title>
<bold>Inversión Costo Capital, Sostenimiento
y Oferta de Empleo</bold>
</title>
</caption>
<alt-text>Tabla 3 Inversión Costo Capital, Sostenimiento
y Oferta de Empleo</alt-text>
<alternatives>
<graphic xlink:href="https://revistadigital.uce.edu.ec/index.php/RevFIG/article/download/50/5500/25617" position="anchor" orientation="portrait"/>
<table style="margin-left:  5.25pt;border-collapse:collapse;border:none;    " id="gt4-526564616c7963">
<tbody>
<tr style="height:17.0pt">
<td style="width:97.65pt;border:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;   height:17.0pt;text-align:center;">
<bold>
  PROYECTO
  </bold>
</td>
<td style="width:142.35pt;border:solid black 1.0pt;border-left:   none;   padding:0cm 0cm 0cm 0cm;height:17.0pt;text-align:center;">
<bold>
  PROYECCIÓN DE
  INVERSIONES,
  COSTO DE CAPITAL
  +
  SOSTENIMIENTO (M
  US$)
  </bold>
</td>
<td style="width:95.2pt;border:solid black 1.0pt;border-left:none;      padding:0cm 0cm 0cm 0cm;height:17.0pt;text-align:center;">
<bold>
  OFERTA DE EMPLEO
  </bold>
</td>
<td style="width:51.0pt;border:solid black 1.0pt;border-left:none;      padding:0cm 0cm 0cm 0cm;height:17.0pt">
<bold>
  PERIODO
  </bold>
</td>
<td style="width:11.35pt;border:solid black 1.0pt;border-left:none;   padding:0cm 0cm 0cm 0cm;height:17.0pt"/>
</tr>
<tr style="height:17.0pt">
<td style="width:97.65pt;border:solid black 1.0pt;border-top:none;      padding:0cm 0cm 0cm 0cm;height:17.0pt">
  EL
  DOMO
  </td>
<td style="width:142.35pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:17.0pt">
  235
  </td>
<td style="width:95.2pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:17.0pt">
  400
  </td>
<td style="width:51.0pt;border-top:none;border-left:none;border-bottom:   solid black 1.0pt;border-right:solid black 1.0pt;      padding:0cm 0cm 0cm 0cm;height:17.0pt">
  2019-2021
  </td>
<td style="width:11.35pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:17.0pt">
  *
  </td>
</tr>
<tr style="height:17.0pt">
<td style="width:97.65pt;border:solid black 1.0pt;border-top:none;      padding:0cm 0cm 0cm 0cm;height:17.0pt">
  FRUTA
  DEL NORTE
  </td>
<td style="width:142.35pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:17.0pt">
  975
  </td>
<td style="width:95.2pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:17.0pt">
  2040
  </td>
<td style="width:51.0pt;border-top:none;border-left:none;border-bottom:   solid black 1.0pt;border-right:solid black 1.0pt;      padding:0cm 0cm 0cm 0cm;height:17.0pt">
  2017-2020
  </td>
<td style="width:11.35pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:17.0pt"/>
</tr>
<tr style="height:17.0pt">
<td style="width:97.65pt;border:solid black 1.0pt;border-top:none;      padding:0cm 0cm 0cm 0cm;height:17.0pt">
  LOMA
  LARGA
  </td>
<td style="width:142.35pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:17.0pt">
  380
  </td>
<td style="width:95.2pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:17.0pt">
  500
  </td>
<td style="width:51.0pt;border-top:none;border-left:none;border-bottom:   solid black 1.0pt;border-right:solid black 1.0pt;      padding:0cm 0cm 0cm 0cm;height:17.0pt">
  2019-2021
  </td>
<td style="width:11.35pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:17.0pt">
  *
  </td>
</tr>
<tr style="height:17.0pt">
<td style="width:97.65pt;border:solid black 1.0pt;border-top:none;      padding:0cm 0cm 0cm 0cm;height:17.0pt">
  MIRADOR
  </td>
<td style="width:142.35pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:17.0pt">
  533
  </td>
<td style="width:95.2pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:17.0pt">
  1200
  </td>
<td style="width:51.0pt;border-top:none;border-left:none;border-bottom:   solid black 1.0pt;border-right:solid black 1.0pt;      padding:0cm 0cm 0cm 0cm;height:17.0pt">
  2016-2018
  </td>
<td style="width:11.35pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:17.0pt"/>
</tr>
<tr style="height:17.0pt;">
<td style="width:97.65pt;border:solid black 1.0pt;border-top:none;   padding:0cm 0cm 0cm 0cm;height:17.0pt">
<bold>
  TOTAL
  </bold>
</td>
<td style="width:142.35pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:17.0pt">
  2123
  </td>
<td style="width:95.2pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:17.0pt">
  4140
  </td>
<td style="width:51.0pt;border-top:none;border-left:none;border-bottom:   solid black 1.0pt;border-right:solid black 1.0pt;   padding:0cm 0cm 0cm 0cm;height:17.0pt"/>
<td style="border:none;padding:0cm 0cm 0cm 0cm"/>
</tr>
</tbody>
</table>
</alternatives>
</table-wrap>
</p>
<p>
<table-wrap id="gt4">
<label>Tabla 4</label>
<caption>
<title>
<bold>Inversión de los proyectos mineros y beneficios al Estado 

 </bold>
</title>
</caption>
<alt-text>Tabla
4 Inversión de los proyectos mineros y beneficios al Estado 

 </alt-text>
<alternatives>
<graphic xlink:href="https://revistadigital.uce.edu.ec/index.php/RevFIG/article/download/50/5500/25618" position="anchor" orientation="portrait"/>
<table style="border-collapse:  collapse;border:none;    " id="gt5-526564616c7963">
<tbody>
<tr style="height:14.15pt">
<td style="width:80.85pt;border:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;   height:14.15pt;text-align:center;">
<bold>
  Proyecto
  </bold>
</td>
<td style="width:84.85pt;border:solid black 1.0pt;border-left:none;   padding:0cm 0cm 0cm 0cm;height:14.15pt;text-align:center;">
  I<bold>ngreso neto
  de fundición (M US$)
  </bold>
</td>
<td style="width:75.4pt;border:solid black 1.0pt;border-left:none;   padding:0cm 0cm 0cm 0cm;height:14.15pt;text-align:center;">
<bold>
  Costo de operación
  (M US$)
  </bold>
</td>
<td style="width:94.25pt;border:solid black 1.0pt;border-left:none;   padding:0cm 0cm 0cm 0cm;height:14.15pt;text-align:center;">
<bold>
  Ganancias para el Estado
  (Regalía + IR
  +Utilidades + IVA)
  (M US$)
  </bold>
</td>
<td style="width:34.75pt;border:solid black 1.0pt;border-left:none;   padding:0cm 0cm 0cm 0cm;height:14.15pt">
<bold>
  Empleo
  </bold>
</td>
<td style="width:59.15pt;border:solid black 1.0pt;border-left:none;   padding:0cm 0cm 0cm 0cm;height:14.15pt;text-align:center;">
  P<bold>eriodo (años)
  </bold>
</td>
</tr>
<tr style="height:14.15pt">
<td style="width:80.85pt;border:solid black 1.0pt;border-top:none;   padding:0cm 0cm 0cm 0cm;height:14.15pt">
  El Domo
  </td>
<td style="width:84.85pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;   height:14.15pt">
  1001
  </td>
<td style="width:75.4pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;   height:14.15pt">
  401
  </td>
<td style="width:94.25pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;   height:14.15pt">
  156
  </td>
<td style="width:34.75pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;   height:14.15pt">
  170
  </td>
<td style="width:59.15pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;   height:14.15pt">
  2021-2035
  </td>
</tr>
<tr style="height:14.15pt">
<td style="width:80.85pt;border:solid black 1.0pt;border-top:none;   padding:0cm 0cm 0cm 0cm;height:14.15pt">
  Fruta
  Del Norte
  </td>
<td style="width:84.85pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;   height:14.15pt">
  5300
  </td>
<td style="width:75.4pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;   height:14.15pt">
  1961
  </td>
<td style="width:94.25pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;   height:14.15pt">
  914
  </td>
<td style="width:34.75pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;   height:14.15pt">
  800
  </td>
<td style="width:59.15pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;   height:14.15pt">
  2020-2033
  </td>
</tr>
<tr style="height:14.15pt">
<td style="width:80.85pt;border:solid black 1.0pt;border-top:none;   padding:0cm 0cm 0cm 0cm;height:14.15pt">
  Loma
  Larga
  </td>
<td style="width:84.85pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;   height:14.15pt">
  1892
  </td>
<td style="width:75.4pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;   height:14.15pt">
  673
  </td>
<td style="width:94.25pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;   height:14.15pt">
  380
  </td>
<td style="width:34.75pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;   height:14.15pt">
  176
  </td>
<td style="width:59.15pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;   height:14.15pt">
  2021-2033
  </td>
</tr>
<tr style="height:14.15pt">
<td style="width:80.85pt;border:solid black 1.0pt;border-top:none;   padding:0cm 0cm 0cm 0cm;height:14.15pt">
  Mirador
  </td>
<td style="width:84.85pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;   height:14.15pt">
  3217
  </td>
<td style="width:75.4pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;   height:14.15pt">
  1276
  </td>
<td style="width:94.25pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;   height:14.15pt">
  613
  </td>
<td style="width:34.75pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;   height:14.15pt">
  2700
  </td>
<td style="width:59.15pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;   height:14.15pt">
  2019-2036
  </td>
</tr>
<tr style="height:14.15pt">
<td style="width:80.85pt;border:solid black 1.0pt;border-top:none;   padding:0cm 0cm 0cm 0cm;height:14.15pt">
<bold>
  TOTAL
  </bold>
</td>
<td style="width:84.85pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;   height:14.15pt">
  11410
  </td>
<td style="width:75.4pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;   height:14.15pt">
  4311
  </td>
<td style="width:94.25pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;   height:14.15pt">
  2063
  </td>
<td style="width:34.75pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;   height:14.15pt">
  3846
  </td>
<td style="width:59.15pt;border-top:none;border-left:none;   border-bottom:solid black 1.0pt;border-right:solid black 1.0pt;padding:0cm 0cm 0cm 0cm;   height:14.15pt"/>
</tr>
</tbody>
</table>
</alternatives>
</table-wrap>
</p>
</sec>
</sec>
</sec>
<sec sec-type="discussion">
<title>
<bold>DISCUSIÓN</bold>
</title>
<p> La falta de un verdadero inventario técnico de recursos y reservas de todo el territorio ecuatoriano ha hecho que se incurra en el desconocimiento del potencial geológico minero, y la disponibilidad de los depósitos minerales con que cuenta hasta la actualidad; por lo que amerita crear las condiciones Legales-Tributarias justas para las partes (estado-inversionistas); con el propósito de incorporar efectivamente esta actividad al desarrollo económico del país. </p>
<p> La subasta funcionaría cuando el ente subastante (Estado) tiene información geológica relevante que dé valor a esas áreas mineras, como trabajos de perforación y por lo menos se disponga de recursos inferidos. Las patentes de conservación deberían ser fijas como parte del incentivo a la inversión nacional y extrajera. </p>
<p> Otro aspecto por considerar es, el cambio en los límites de los volúmenes de producción de las diferentes categorías de explotación de minería metálica. </p>
<p> En la actualidad, la carga fiscal vigente constituye el 37%, siendo este uno de los más altos de la región; situación que llevó al gobierno entre 2014-2015 a efectuar ciertas reformas tributarias y al <xref ref-type="bibr" rid="redalyc_6243939001_ref21">reglamento minero</xref>.</p>
<p> Por ser un país tradicionalmente no minero respecto a la intensidad con que se lleva esta actividad en el resto de países de la región, se ha incurrido en la falta de agilidad para viabilizar la discusión de las normativas Legales y Tributarias; sin que se permita oportunamente la operación de los proyectos mineros; consecuencia de lo cual se tiene un retraso en cuanto a ser receptores de nuevas tecnologías mineras; e ingresos extemporáneos por desarrollo económico minero. </p>
<p> Los contratos de explotación minera, de los proyectos con reservas probadas y estudios de factibilidad, necesitan actualizar sus respectivos análisis de riesgos, conforme se realicen cambios o actualizaciones en la Normativa nacional vigente. Se espera a corto plazo una estabilidad jurídica, con la que se replique confianza para nuevas inversiones no solamente en proyectos mineros.</p>
</sec>
<sec sec-type="conclusions">
<title>
<bold>CONCLUSIONES</bold>
</title>
<p> Las inversiones realizadas por la empresa privada y pública desde 1980 hasta 2009, no ha sido cuantificada; sin embargo los principales depósitos descubiertos, próximos a ser explotados fueron durante este periodo. </p>
<p>En el análisis del marco Legal Minero en el Ecuador se ha determinado que ha variado desde la<xref ref-type="bibr" rid="redalyc_6243939001_ref3"> Constitución de 2008</xref>, debido a modificaciones que han afectado las inversiones mineras privadas, como las establecidas en el Art. 408 de esta constitución según el cual el Estado participará de los beneficios y aprovechamiento de los recursos naturales, en un monto que no será inferior a los de la empresa que los explota; un impuesto del 50.1% considerado uno de los más altos del mundo.</p>
<p>El catastro minero no es abierto, como lo es en países mineros, donde prevalece el derecho de quien primero lo solicita. Para concesionar un área minera en Ecuador es necesario un remate o subasta pública, donde la Empresa Nacional Minera ENAMI EP, tiene la primera opción, si ella está interesada, lo que no hace atractivo a la inversión de empresas mineras privadas en el Ecuador. </p>
<p>Según flujos de caja de los proyectos Fruta del Norte, Mirador, Loma Larga y El Domo, la carga fiscal en el Ecuador varía entre 38% a 45%. Pero un análisis realizado por el Ministerio de Minería y <xref ref-type="bibr" rid="redalyc_6243939001_ref18">Wood Mackenzie (2016)</xref> concluyen que la carga fiscal en el Ecuador está cercana al 27%, existiendo un desfase de flujos de carga fiscal analizados. </p>
<p>Según información disponible de los principales proyectos mineros y de acuerdo a informes con norma internacional NI 43-101, para el Ecuador se tiene: Reservas de Oro 8.5 M oz y Plata 19.2 M oz y Recursos 23.8 M oz y 168.3 M oz. </p>
<p>La inversión inicial (CAPEX) sumada de los 4 proyectos será de: 2,123 millones de dólares (<xref ref-type="table" rid="gt3">tabla 3</xref>), durante el periodo de construcción entre los años 2017 al 2021. </p>
<p>La oferta de empleo directo durante la construcción de la infraestructura de las minas, comprendida entre el 2017 al 2021 será de 4,140 empleos directos, de los cuales 30% corresponden a técnicos, administrativos y gerenciales; 70% a operadores y obreros, de preferencia personal local de las zonas de influencia de los proyectos mineros; y para el período 2021 al 2038 será de 3,846 empleos directos (<xref ref-type="table" rid="gt4">tabla 4</xref>). </p>
<p>Se estima que la generación de empleo indirecto asociado al desarrollo de los proyectos mineros en la etapa de operación de las minas será aproximadamente entre 15 mil y 20 mil puestos de trabajo. </p>
<p>El ingreso neto de fundición (NSR) sumado los 4 proyectos es de 11,410 millones de dólares (<xref ref-type="table" rid="gt4">tabla 4</xref>), en aproximadamente en 17 años de producción y el beneficio del estado estimado de los 4 proyectos es aproximadamente de 5,700 millones de dólares considerando un 50% de la suma de costo neto de fundición. </p>
<p>Los beneficios económicos para el estado sumados los 4 proyectos y que corresponden a regalía + IR + utilidades + IVA, en 17 años de vida útil de las minas será de 2,063 millones de dólares. Con un promedio anual de ganancias por impuestos de 150 millones de dólares en función del precio de los metales en el mercado.</p>
<sec sec-type="conclusions">
<title>
<bold>RECOMENDACIONES</bold>
</title>
<p>Como resultado de este trabajo de
investigación se sugiere un cambio en la Normativa Legal, específicamente en
los siguientes artículos:</p>
<p>
<list list-type="bullet">
<list-item>
<p>Art. 29. Del remate y subasta pública
para el otorgamiento de concesiones mineras. Es importante hacer un cambio en
este artículo de la Ley, otorgando concesiones mineras al primero que lo pida,
cumpliendo requisitos como capacidad técnica y económica de inversión, como lo
es en otros países de la región. La subasta funcionaría cuando el ente subastante (Estado) tiene información geológica relevante
que dé valor a esas áreas mineras, como trabajos de perforación y por lo menos
se disponga de recursos inferidos.</p>
</list-item>
<list-item>
<p>Art. 34. Patente de conservación para
concesión. Las patentes de conservación son muy altas y están atadas al SBU,
por lo que anualmente hay incrementos; si queremos que la inversión extranjera
para la industria minera llegue a nuestro país debemos bajar estas tarifas y
dejarlas fijas.</p>
</list-item>
<list-item>
<p>Los volúmenes de producción. Se debe
incrementar los volúmenes de producción de las diferentes categorías de
explotación de minería metálica: Para Pequeña Minería debería ser por lo menos
hasta 1000 ton/día en subterráneo y hasta 2000 ton/día a cielo abierto; para
Mediana Minería debería ser por lo menos 5000 ton/día en subterráneo y de 7500
ton/día a cielo abierto y Gran Minería sobre esos límites. Estas
recomendaciones se las plantea en base a sustentos técnicos económicos, considerando
la experiencia de países mineros donde los volúmenes de producción para estas
categorías de explotación son similares a las recomendaciones planteadas y
representan buenas condiciones para el desarrollo del sector minero.</p>
</list-item>
<list-item>
<p>Art. 165. Concepto de Ingresos
Extraordinarios. Es un impuesto que no existe en otras legislaciones del mundo,
y al aplicarlo en nuestro país se convierte en un desincentivo a la inversión
nacional e internacional.</p>
</list-item>
</list>
</p>
<p> Contrato de Explotación. Debemos
eliminar de nuestra normativa legal el Contrato de Explotación. En otros países
mineros, los títulos mineros desde el primer día establecen condiciones y los
términos que van a regir al titular concesionario durante toda la vida de la
concesión. En Ecuador cuando se solicita una concesión se investiga y explora
y, si se va a empezar a explotar, se necesita negociar con el gobierno un
Contrato de Explotación, esto genera gran incertidumbre y ahuyenta a los
inversionistas, porque no saben cuáles van a ser los términos económicos que se
van a aplicar en la fase de explotación, luego de identificar un yacimiento
minero.</p>
</sec>
</sec>
</body>
<back>
<ref-list>
<title>
<bold>BIBLIOGRAFÍA</bold>
</title>
<ref id="redalyc_6243939001_ref1">
<mixed-citation>Asamblea Constituyente. (2008). <italic>Mandato Constituyente No 6.</italic> Montecristi, Ecuador.</mixed-citation>
<element-citation publication-type="legal-doc">
<person-group person-group-type="author">
<collab>Asamblea Constituyente</collab>
</person-group>
<source>Mandato Constituyente Nº 6</source>
<year>2008</year>
<publisher-loc>Montecristi, Ecuador.</publisher-loc>
</element-citation>
</ref>
<ref id="redalyc_6243939001_ref2">
<mixed-citation>Calvo, G., &amp; Johnston, A. (2016). <italic>Curipamba Project-El Domo Deposit Preliminary Economic Assessment</italic>. Toronto: FAusIMM.</mixed-citation>
<element-citation publication-type="report">
<person-group person-group-type="author">
<name>
<surname>Calvo</surname>
<given-names>G.</given-names>
</name>
<name>
<surname>Johnston</surname>
<given-names>A.</given-names>
</name>
</person-group>
<source>Curipamba Project-El Domo Deposit Preliminary Economic Assessment</source>
<year>2016</year>
<publisher-loc>Toronto</publisher-loc>
<publisher-name>FAusIMM</publisher-name>
</element-citation>
</ref>
<ref id="redalyc_6243939001_ref3">
<mixed-citation>
<italic>Constitución de la República del Ecuador</italic>. (20 de octubre de 2008). Quito: Registro Oficial No. 449.</mixed-citation>
<element-citation publication-type="legal-doc">
<source>Constitución de la República del Ecuador</source>
<year>2008</year>
<publisher-loc>Quito</publisher-loc>
<comment>Registro Oficial No. 449.</comment>
</element-citation>
</ref>
<ref id="redalyc_6243939001_ref4">
<mixed-citation>Córdoba, J. (2016). <italic>Rendición de Cuentas 2015</italic>. Ministerio de Minería. Quito.</mixed-citation>
<element-citation publication-type="report">
<person-group person-group-type="author">
<name>
<surname>Córdoba</surname>
<given-names>J.</given-names>
</name>
</person-group>
<source>Rendición de Cuentas 2015</source>
<year>2016</year>
<publisher-loc>Quito</publisher-loc>
<publisher-name>Ministerio de Minería</publisher-name>
</element-citation>
</ref>
<ref id="redalyc_6243939001_ref5">
<mixed-citation>CRIRSCO. (2013). <italic>International reporting template</italic>.</mixed-citation>
<element-citation publication-type="report">
<person-group person-group-type="author">
<collab>CRIRSCO</collab>
</person-group>
<source>International reporting template</source>
<year>2013</year>
</element-citation>
</ref>
<ref id="redalyc_6243939001_ref6">
<mixed-citation>Decreto Ejecutivo No. 475. (27 de octubre de 2014).<italic> Impuesto a los Ingresos Extraordinarios y Aplicación del Ajuste Soberano</italic>. Quito.</mixed-citation>
<element-citation publication-type="other">
<person-group person-group-type="author">
<collab>Decreto Ejecutivo No. 475</collab>
</person-group>
<source>Impuesto a los Ingresos Extraordinarios y Aplicación del Ajuste Soberano</source>
<year>2014</year>
<publisher-loc>Quito</publisher-loc>
<comment>27 de
octubre de 2014</comment>
</element-citation>
</ref>
<ref id="redalyc_6243939001_ref7">
<mixed-citation>Drobe, J., &amp; Hoffert, J. (2008). <italic>Mirador Copper Gold Project 30,000 TPD feasibility study, Zamora Chinchipe Ecuador</italic>. Toronto: Ecuacorriente S.A. (ECSA).</mixed-citation>
<element-citation publication-type="report">
<person-group person-group-type="author">
<name>
<surname>Drobe</surname>
<given-names>J.</given-names>
</name>
<name>
<surname>Hoffert</surname>
<given-names>J.</given-names>
</name>
</person-group>
<source>Mirador Copper Gold Project Zamora Chinchipe Ecuador</source>
<year>2008</year>
<publisher-loc>Toronto</publisher-loc>
<publisher-name>Ecuacorriente S.A. (ECSA).</publisher-name>
</element-citation>
</ref>
<ref id="redalyc_6243939001_ref8">
<mixed-citation>Dynasty Metals &amp; Mining Inc. (2014).<italic> Independent Preliminary Assessment, Zaruma Gold Project</italic>. Toronto: Form 43-101F1.</mixed-citation>
<element-citation publication-type="report">
<person-group person-group-type="author">
<collab>Dynasty Metals &amp; Mining Inc</collab>
</person-group>
<source>Independent Preliminary Assessment Zaruma Gold Project</source>
<year>2014</year>
<publisher-loc>Toronto</publisher-loc>
<comment>Form 43-101F1</comment>
</element-citation>
</ref>
<ref id="redalyc_6243939001_ref9">
<mixed-citation>
<italic>Extrayendo Transparencia</italic>. (15 de marzo de 2011). (G. Faro, Productor) Obtenido de Información ciudadana sobre minas y petróleos: <ext-link ext-link-type="uri" xlink:href="http://extrayendo-transparencia.grupofaro.org/normativa-completa-sector-minero-ecuador/#.VTHDpOuoUc">http://extrayendo-transparencia.grupofaro.org/normativa-completa-sector-minero-ecuador/#.VTHDpOuoUc</ext-link>
</mixed-citation>
<element-citation publication-type="webpage">
<source>Extrayendo Transparencia</source>
<year>2011</year>
<comment>
<ext-link ext-link-type="uri" xlink:href="http://extrayendo-transparencia.grupofaro.org/normativa-completa-sector-minero-ecuador/#.VTHDpOuoUc">http://extrayendo-transparencia.grupofaro.org/normativa-completa-sector-minero-ecuador/#.VTHDpOuoUc</ext-link>
</comment>
<comment>(G. Faro, Productor) Obtenido de Información ciudadana sobre
minas y petróleos</comment>
</element-citation>
</ref>
<ref id="redalyc_6243939001_ref10">
<mixed-citation>Forter Wheeler, A., &amp; Crippen Berger, K. (2016). <italic>Fruta Del Norte Project Ecuador, NI 43-101 Technical Report on Feasibility Study</italic>. Toronto: Lundin Gold INC.</mixed-citation>
<element-citation publication-type="report">
<person-group person-group-type="author">
<name>
<surname>Forter Wheeler</surname>
<given-names>A.</given-names>
</name>
<name>
<surname>Crippen Berger</surname>
<given-names>K.</given-names>
</name>
</person-group>
<source>Fruta Del Norte Project Ecuador NI Technical Report on Feasibility Study</source>
<year>2016</year>
<publisher-loc>Toronto</publisher-loc>
<publisher-name>Lundin Gold INC</publisher-name>
</element-citation>
</ref>
<ref id="redalyc_6243939001_ref11">
<mixed-citation>Henderson, W. (1979). Cretaceous to Eocene volcanic arc activity in the Andes of northern Ecuador. <italic>Journal of the Geological Society</italic>, 136, 367-378.</mixed-citation>
<element-citation publication-type="journal">
<person-group person-group-type="author">
<name>
<surname>Henderson</surname>
<given-names>W.</given-names>
</name>
</person-group>
<article-title>Cretaceous to Eocene volcanic arc activity in the Andes of northern Ecuador</article-title>
<source>Journal of the Geological Society</source>
<year>1979</year>
<volume>136</volume>
<fpage>367</fpage>
<lpage>378</lpage>
</element-citation>
</ref>
<ref id="redalyc_6243939001_ref12">
<mixed-citation>Hennessey, B. T. (2005). <italic>Mineral Resources Estimate for the Macuchi Project Largo Resources Ltd.</italic> Toronto: Micon International Limited.</mixed-citation>
<element-citation publication-type="report">
<person-group person-group-type="author">
<name>
<surname>Hennessey</surname>
<given-names>B. T.</given-names>
</name>
</person-group>
<source>Mineral Resources Estimate for the Macuchi Project Largo Resources Ltd</source>
<year>2005</year>
<publisher-loc>Toronto</publisher-loc>
<publisher-name>Micon International Limited.</publisher-name>
</element-citation>
</ref>
<ref id="redalyc_6243939001_ref13">
<mixed-citation>INIGEMM. (8 de abril de 2016). <italic>Expominas</italic>. Quito: Instituto de Investigación Geológico Minero Metalúrgico.</mixed-citation>
<element-citation publication-type="confproc">
<person-group person-group-type="author">
<collab>INIGEMM</collab>
</person-group>
<source>Expominas</source>
<year>2016</year>
<publisher-loc>Quito</publisher-loc>
<publisher-name>Instituto de Investigación Geológico Minero Metalúrgico</publisher-name>
</element-citation>
</ref>
<ref id="redalyc_6243939001_ref14">
<mixed-citation>
<italic>Ley de Minería</italic>. (31 de mayo de 1991). Ley No. 126 RO/ Suplemento 695. Quito, Ecuador.</mixed-citation>
<element-citation publication-type="legal-doc">
<source>Ley No. 126 RO</source>
<year>1991</year>
<publisher-loc>Quito, Ecuador.</publisher-loc>
<comment> Suplemento 695</comment>
<comment>31 de mayo </comment>
</element-citation>
</ref>
<ref id="redalyc_6243939001_ref15">
<mixed-citation>
<italic>Ley de Minería</italic>. (29 de enero de 2009). Registro Oficial No.517. Quito, Ecuador.</mixed-citation>
<element-citation publication-type="legal-doc">
<source>Ley de Minería</source>
<year>2009</year>
<publisher-loc>Quito, Ecuador.</publisher-loc>
<comment>Registro Oficial No.517</comment>
<comment>29 de enero de
2009</comment>
</element-citation>
</ref>
<ref id="redalyc_6243939001_ref16">
<mixed-citation>
<italic>Ley Orgánica Reformatoria a la Ley de Minería</italic>. (16 de julio de 2013). Ley Orgánica Reformatoria a la Ley de Minería, a la Ley Reformatoria para la Equidad Tributaria del Ecuador y a la Ley Orgánica de Régimen Tributario Interno. Quito: Registro Oficial No. 37.</mixed-citation>
<element-citation publication-type="legal-doc">
<source>Ley Orgánica Reformatoria a la Ley de Minería, a la Ley Reformatoria para la Equidad Tributaria del Ecuador y a la Ley Orgánica de Régimen Tributario Interno</source>
<year>2013</year>
<publisher-loc>Quito</publisher-loc>
<publisher-name>Registro Oficial No. 37.</publisher-name>
<comment>16 de julio de 2013</comment>
</element-citation>
</ref>
<ref id="redalyc_6243939001_ref17">
<mixed-citation>Litherland, M., Aspden, J., &amp; Jemielita, R. (1994). <italic>The metamorphic belts of Ecuador</italic>. Keyworth, Nottingham, U.K: British Geological Survey.</mixed-citation>
<element-citation publication-type="book">
<person-group person-group-type="author">
<name>
<surname>Litherland</surname>
<given-names>M.</given-names>
</name>
<name>
<surname>Aspden</surname>
<given-names>J.</given-names>
</name>
<name>
<surname>Jemielita</surname>
<given-names>R.</given-names>
</name>
</person-group>
<source>The metamorphic belts of Ecuador</source>
<year>1994</year>
<publisher-loc>Keyworth, Nottingham, U.K</publisher-loc>
<publisher-name>British Geological Survey.</publisher-name>
</element-citation>
</ref>
<ref id="redalyc_6243939001_ref18">
<mixed-citation>Mackenzie, W. (2016). <italic>Análisis de la Situación Fiscal en el Sector Minero</italic>. Quito.</mixed-citation>
<element-citation publication-type="report">
<person-group person-group-type="author">
<name>
<surname>Mackenzie</surname>
<given-names>W.</given-names>
</name>
</person-group>
<source>Análisis de la Situación Fiscal en el Sector Minero</source>
<year>2014</year>
<publisher-loc>Quito</publisher-loc>
</element-citation>
</ref>
<ref id="redalyc_6243939001_ref19">
<mixed-citation>Minería en el Ecuador bajo sus propias condiciones. (2012). <italic>Revista Business News Américas</italic>.</mixed-citation>
<element-citation publication-type="journal">
<person-group person-group-type="author">
<collab>Minería en el Ecuador bajo sus propias condiciones</collab>
</person-group>
<article-title>Minería en el Ecuador bajo sus propias condiciones</article-title>
<source>Revista Business News Américas</source>
<year>2012</year>
</element-citation>
</ref>
<ref id="redalyc_6243939001_ref20">
<mixed-citation>Plan Nacional para el Buen Vivir 2013 2017. (2013). <italic>Plan Nacional de Desarrollo</italic>. Quito: SENPLADES.</mixed-citation>
<element-citation publication-type="other">
<person-group person-group-type="author">
<collab>Plan Nacional para el Buen Vivir</collab>
</person-group>
<source>Plan Nacional para el Buen Vivir 2013 2017</source>
<year>2013</year>
<publisher-loc>Quito</publisher-loc>
<publisher-name>SENPLADES</publisher-name>
</element-citation>
</ref>
<ref id="redalyc_6243939001_ref21">
<mixed-citation>
<italic>Reformas al Reglamento General a la Ley de Minería.</italic> (25 de noviembre de 2015). Quito: Registro Oficial No. 635 Suplemento No. 823.</mixed-citation>
<element-citation publication-type="legal-doc">
<source>Reformas al Reglamento General a la Ley de Minería</source>
<year>2015</year>
<publisher-loc>Quito</publisher-loc>
<publisher-name>Registro Oficial No. 635 Suplemento No. 823.</publisher-name>
<comment>25 de noviembre de
2015</comment>
</element-citation>
</ref>
<ref id="redalyc_6243939001_ref22">
<mixed-citation>Regis, R. (2013). <italic>Gerente de Tax &amp; Legal</italic>. Perú.</mixed-citation>
<element-citation publication-type="other">
<person-group person-group-type="author">
<name>
<surname>Regis</surname>
<given-names>R.</given-names>
</name>
</person-group>
<source>Gerente de Tax &amp; Legal</source>
<year>2013</year>
<publisher-loc>Perú</publisher-loc>
</element-citation>
</ref>
<ref id="redalyc_6243939001_ref23">
<mixed-citation>
<italic>Reglamento de Calificación de Recursos y Reservas Mineras</italic>. (17 de marzo de 2016). Quito: Registro oficial Suplemento No. 714.</mixed-citation>
<element-citation publication-type="legal-doc">
<source>Reglamento de Calificación de Recursos y Reservas Mineras</source>
<year>2016</year>
<publisher-loc>Quito</publisher-loc>
<publisher-name>Registro oficial Suplemento No. 714.</publisher-name>
<comment>(17 de marzo de 2016</comment>
</element-citation>
</ref>
<ref id="redalyc_6243939001_ref24">
<mixed-citation>
<italic>Reglamento General de la Ley de Minería</italic>. (16 de noviembre de 2009). Quito: Registro Oficial Suplemento No.67.</mixed-citation>
<element-citation publication-type="legal-doc">
<source>Reglamento General de la Ley de Minería</source>
<year>2009</year>
<publisher-loc>Quito</publisher-loc>
<publisher-name>Registro Oficial Suplemento No.67.</publisher-name>
<comment>16 de noviembre de 2009</comment>
</element-citation>
</ref>
<ref id="redalyc_6243939001_ref25">
<mixed-citation>Roscoe Postle Associates Inc. (2016). <italic>Inv Metals Inc., technical report on the Loma Larga Project, Azuay Province, Ecuador. </italic>Toronto.</mixed-citation>
<element-citation publication-type="report">
<person-group person-group-type="author">
<collab>Roscoe Postle Associates Inc</collab>
</person-group>
<source>Inv Metals Inc., technical report on the Loma Larga Project, Azuay Province, Ecuador.</source>
<year>2016</year>
<publisher-loc>Toronto</publisher-loc>
</element-citation>
</ref>
<ref id="redalyc_6243939001_ref26">
<mixed-citation>Soria, F., &amp; Aguila, C. (2016). <italic>Evaluación del impacto que tendrá en la economía del país, el inicio de la producción de los depósitos de minerales metálicos</italic>
</mixed-citation>
<element-citation publication-type="other">
<person-group person-group-type="author">
<name>
<surname>Soria</surname>
<given-names>F.</given-names>
</name>
<name>
<surname>Aguila</surname>
<given-names>C.</given-names>
</name>
</person-group>
<source>Evaluación del impacto que tendrá en la economía del país el inicio de la producción de los depósitos de minerales metálicos</source>
<year>2016</year>
</element-citation>
</ref>
</ref-list>
</back>
</article>
