Proposal to control the formation and development of bulking in a wastewater treatment plant with extended aeration. Case study: Wastewater treatment plant (wwtp), Quitumbe
Main Article Content
Abstract
Quitumbe’s Wastewater Treatment Plant, in the city of Quito presented Bulking in its prolonged aeration through activated sludges process, which developed foaming on the biological reactors’ surface, therefore, to solve it, the historical and experimental data from the quality of water and operation parameters have been statistically analyzed and contrasted with the permissible limits for “discharges into water streams” regulations issued by; The Ministerial Agreement 097-A and The Metropolitan Ordinance 404 in order to evaluate contaminants removal. Being also calculated a model focused on the review of the existing design to compare the current operative conditions against the calculated ones. Lastly, concluding that the origin of the sludge bulking is purely operational, two proposals were made: The first entails the addition of a stabilizer substance (calcium hydroxide) into the biological reactor; and the second one, based on the efficient operation, consists in programming the purge of the excess sludges.
Keywords: permissible limits/ control parameters/ wastewater/ bulking
Downloads
Metrics
Article Details
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
References
J. Alzate, «Remoción biológica de nitrógeno por nitrificación y desnitrificación aeróbica en reactor de cargassecuenciales sbr», Tratto da Universidad Nacional de La Plata, 2019. http://sedici.unlp.edu.ar/bitstream/handle/10915/84134/Documento_completo.pdf-pdfa2u.pdf?sequence=1&isAllowed=y
G. Salinas, «Control preventivo y correctivo del bulking filamentoso y espumas», tesis de ingeniero civil-químico Pontificia Universidad Católica de Valparaíso, 2013. Recuperado el 21 de junio de 2019; primera edición: pp. 68-75. Disponible en: http: http://opac.pucv.cl/pucv_txt/txt-8500/ucf8855_01.pdf
J. Carrera, «Eliminación biológica de nitrógeno en un efluente con alta carga», 2001, obtenido de Universitat Autònoma de Barcelona https://www.tdx.cat/bitstream/handle/10803/5299/jcm1de1.pdf?sequence=1&isallowed=y
Metcalf & Eddy, Wastewater engineering: treatment and reuse. McGraw Hill, 2003.
A. Zornoza, S. Serrano y J. L. Alonso, «Environmental ordination of filamentous», 2017.
epmaps, Manual de operación y mantenimiento de la planta de tratamiento de aguas residuales Quitumbe, Empresa Pública Metropolitana de Agua Potable y Saneamiento de Quito, 2018.
M. Carlini, Problemas operacionales en plantas de tratamiento, 2003, recuperado el 10 de julio de 2019; primera edición: pp.12-20 Disponible en: https://www.puntoambiental.com/informes/problemas_operacionales_en_plantas_de_tratamiento.pdf
K. Contreras Bernal, Control de bulking filamentoso en procesos de lodos activados con aireación extendida, tesis de ingeniero-civil químico, Pontificia Universidad Católica de Valparaíso, 2010. Recuperado el 21 de junio de 2019; primera edición: pp. 66-69. Disponible en: http://opac.pucv.cl/pucv_txt/txt-1000/ucg1411_01.pdf
ose, Cálculos básicos para la operación de la ptar Canelones, 2016.
G. Buitrón, C. Reino y J. Carrera, Manual técnico sobre tecnologías biológicas aerobias aplicadas al tratamiento de aguas residuales industriales. Tratto da Programa Iberoamericano Ciencia y Tecnología para el Desarrollo, 2018, Recuperado de: http://www.cyted.org/sites/default/files/tratamiento_aerobio_de_aguas_residuales.pdf
M. Von Sperling, «Dimensionamento de lodos ativados por batelada utilizando os principios da teoría da flujo de sólidos», Universidad Federal de Minas Gerais, 2001. Recuperado el 3 de julio de 2019 de Departamento de Engenharia Sanitária e Ambiental da ufmg4website: http://aves_dn.org.br/publicacoes/engenharia/resaonline/v6n34/v6n34a05.pd