Adaptation of PMBOK in open-pit mining project management

Main Article Content

Daniel Rodrigo Alegría-Calero
https://orcid.org/0000-0002-4477-3705
Lenin Andrés Guamán-Acuña
https://orcid.org/0000-0002-7060-9474
Andy Leonardo Robles-Riofrío
https://orcid.org/0009-0001-6154-4875
Steven Fernando Toapanta-Delgado
https://orcid.org/0009-0001-0015-5008
Anderson Steven Tonato-Pillajo
https://orcid.org/0000-0001-7056-2074

Abstract

Open-pit mining is a highly complex and risky activity, both environmentally and operationally, requiring efficient management to maximize productivity and minimize negative impacts. This study focuses on adapting the principles of the seventh edition of the Project Management Body of Knowledge (PMBOK) to this specific sector, offering a technical and detailed guide for mining project management. Given the scale of operations and the significant associated environmental impact, there is a need for a structured management framework tailored to the particularities of open-pit mining. The main objective is to adapt the PMBOK processes and practices to the needs of this type of mining, developing a technical guide that includes sector-specific tools. The study's methodology involves a comprehensive review of PMBOK and its practical application in the context of open-pit mining, using techniques such as the Critical Path Method (CPM), Gantt charts, and specialized project management software like Microsoft Project and Primavera P6. The results yield an adaptation of PMBOK for managing open-pit mining projects, aiming to improve planning, manage environmental and operational risks more effectively, and facilitate more efficient communication among stakeholders. Additionally, a reduction in downtime and improved cost control are expected outcomes. This adaptation provides a structured yet flexible approach that can adjust to changing project conditions, enhancing operational efficiency and ensuring greater sustainability in open-pit mining projects.

Downloads

Download data is not yet available.

Metrics

Metrics Loading ...

Article Details

How to Cite
Alegría-Calero, D. R., Guamán-Acuña, L. A., Robles-Riofrío, A. L., Toapanta-Delgado, S. F., & Tonato-Pillajo, A. S. (2024). Adaptation of PMBOK in open-pit mining project management . FIGEMPA: Investigación Y Desarrollo, 18(2), 153–161. https://doi.org/10.29166/revfig.v18i2.7159
Section
Artículos
Author Biographies

Daniel Rodrigo Alegría-Calero, Universidad Central del Ecuador. Quito, Ecuador

Facultad de Ingeniería en Geología, Minas, Petróleos y Ambiental . 170201. Quito, Pichincha

Lenin Andrés Guamán-Acuña, Universidad Central del Ecuador. Quito, Ecuador

Carrera de Ingeniería de Minas

Andy Leonardo Robles-Riofrío, Universidad Central del Ecuador. Quito, Ecuador

Carrera de Ingeniería de Minas

Steven Fernando Toapanta-Delgado, Universidad Central del Ecuador. Quito, Ecuador

Carrera de Ingeniería de Minas

Anderson Steven Tonato-Pillajo, Universidad Central del Ecuador. Quito, Ecuador

Carrera de Ingeniería de Minas

References

Acevedo Díaz, J. A., Garcés Gutiérrez, D. I., & Hernández García, D. (2021) “Gestión de la comunicación en programas de responsabilidad social en el sector minero”, Investigación & Desarrollo, 29(1), pp. 69–98. Disponible en: https://doi.org/10.14482/INDES.29.1.658.45

Badri, A., Nadeau, S., & Gbodossou, A. (2011) “Integration of OHS into Risk Management in an Open-Pit Mining Project in Quebec (Canada)”, Minerals, 1(1), pp. 3-29. Disponible en: https://doi.org/10.3390/min1010003

Chen, J., Brem, A., Viardot, E., & Wong, P.K. (2019) The Routledge Companion to Innovation Management. 1ª ed. Londres: Routledge. Disponible en: https://doi.org/10.4324/9781315276670

Chaudhry, M. S., et al. (2012) “The Impact of Leadership on Project Performance”, Industrial Engineering Letters, 2(2), pp. 18-24. Disponible en: https://www.iiste.org/Journals/index.php/IEL/article/view/1438

Fortuny-Santos, J., et al. (2021) “Estudio de la aplicabilidad de lean management en la industria minera”, Dirección y Organización, (73), pp. 96–106. Disponible en: https://doi.org/10.37610/dyo.v0i73.595

Galindos Pino, L. A. (2023). La gestión de costos de la guía PMBOK y su aplicación en la ejecución de la carretera de tercera clase del distrito de Chao - 2022. Tesis de grado. Universidad Nacional de Trujillo. Disponible en: https://repositorio.ucv.edu.pe/handle/20.500.12692/115073

Hallahan, K., Holtzhausen, D., van Ruler, B., Verčič, D., & Sriramesh, K. (2007) “Defining Strategic Communication”, International Journal of Strategic Communication, 1(1), pp. 3–35. Disponible en: https://doi.org/10.1080/15531180701285244

Hartley, S. (2018) Project Management: A practical guide to planning and managing projects. 4ª ed. Londres: Routledge. Disponible en: https://doi.org/10.4324/9781003116882

Herrera, J. (2018) El proceso de evaluación de un proyecto minero. Vol. 2. Madrid: Universidad Politécnica de Madrid. Disponible en: https://oa.upm.es/70265/

Imata, V. (2023) Propuesta de implementación de un proyecto de mejora de procesos hacia la transformación digital de una empresa del sector minero basado en la guía del PMBOk séptima edición 2021. Tesis de Grado. Universidad Católica de Santa María. Disponible en: https://hdl.handle.net/20.500.12920/13256

Lecoeuvre, L. (2016) The Performance of Projects and Project Management: Sustainable Delivery in Project Intensive Companies. 1ª ed. Londres: Routledge Disponible en: https://doi.org/10.4324/9781315554785

Maley, C.H. (2024) How Not to Fail at Projects: Stopping the Project Management Insanity Spiral. 1ª ed. New York: Auerbach Publications. Disponible en: https://doi.org/10.1201/9781003471691

Mudd, G.M. (2010) “The environmental sustainability of mining in Australia: Key mega-trends and looming constraints”, Resources Policy, 35(2), pp. 98-115. Disponible en: https://doi.org/10.1016/j.resourpol.2009.12.001

New, M., et al. (2022) “Decision-Making Options for Managing Risk”. In Climate Change 2022 – Impacts, Adaptation and Vulnerability: Working Group II Contribution to the Sixth Assessment Report of the Intergovernmental Panel on Climate Change. Cambridge: Cambridge University Press, pp. 2539–2654. Disponible en: https://doi.org/10.1017/9781009325844.026

Project Management Institute (2021) A guide to the Project Management Body Of Knowledge (PMBOK GUIDE). 7th Edition. Project Management Institute. Disponible en: https://www.pmi.org/standards/pmbok

Valega Contreras, O. M., & Natividad Pimentel, J. A. (2023) Optimización de costos aplicando la herramienta de gestión de proyectos alineado al PMBOK en un proyecto minero de ingeniería. Tesis de grado. Universidad Tecnológica del Perú. Disponible en: https://repositorio.utp.edu.pe/handle/20.500.12867/9714

Yakovleva, N., & Nickless, E. (2022). Routledge Handbook of the Extractive Industries and Sustainable Development. 1ª ed. London: Routledge. Disponible en: https://doi.org/10.4324/9781003001317