Methodology of technical evaluation on field of water injection pilot projects
Main Article Content
Abstract
The purpose of this document is to evaluate the water injection pilot projects implemented as part of the secondary recovery expansion project in the Shushufindi oilfield through the technical monitoring on field of the production parameters that allow identifying the influence of the project in the production wells during 2019-2020. The methodology used is based on the control and monitoring of the data obtained on field, which allows identifying if there is variation in the behavior of the production or injection parameters. For the development of this study, the water injection performance was evaluated, using the Hall plot and injectivity index of each injector well. Moreover, the production parameters of the selected wells near the influence area were analyzed. Among the parameters that were evaluated were: salinity, pressures, flow rates, electrical submersible pump parameters, and workovers carried out during the evaluation period. Once the evaluation of the injection influence was completed, it was determined whether the maintenance of the production is related of the water injection or other types of work performed during the evaluation period.
Downloads
Metrics
Article Details
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
References
Ahmed, T. (2019). Reservoir Engineering Handbook (Quinta ed.). K. Hammon, Ed.) United States: Elsevier Science & Technology
Amedu, J. & Nwokolo, C. (2013). Improved Well and Reservoir Production Performance in Waterflood Reservoirs-Revolutionalizing the Hall Plot. SPE Nigeria Annual International Conference and Exhibition, Lagos, Nigeria, August 2013. https://doi.org/10.2118/167602-MS
Aragón, A., Izquierdo, G., & Gómez, R. (2014). Comparación de metodologías de análisis de declinación de la productividad en pozos. Tecnología y Ciencias del Agua, V(6), 119-134.
Arps, J. (1945). Analysis of Decline Curves. Houston: Transactions of the American Institute of Mining Metallurgical and Petroleum Engineers.
Baby, P., Rivadeneira, M., & Barragán, R. (2014). La Cuenca Oriente: Geología y Petróleo (Tercera ed.). Quito.
CIED PDVSA. (1997). Recobro Adicional de Petróleo por Métodos Convencionales (Segunda ed.). Zulia, Venezuela.
Cobb, W., & Smith, J. (1997). Waterflooding. Dallas: Champaign, III: Midwest Office of the Petroleum Technology Transfer Council.
Comisión Europea. (2021). Inspire-Salinidad del agua.
Consorcio Shushufindi. (2018). Piloto Inyección de agua CSSFD. Junio, Quito.
Dike, F., Aboaja, U., Ogunlade, K., Kefe, A. & Rotimi, O. (2012). Determination of Abandonment Reservoir Pressure, GOR and BSW for Well Performance Evaluation. Paper presented at the Nigeria Annual International Conference and Exhibition, Lagos, Nigeria, August. doi: https://doi.org/10.2118/162957-MS
Giraldo, F., Lafournere, J., Marín, G., Navarrete, P., Suter, A. & Villanueva, G. (2014). Shushufindi: El renacimiento de un gigante. Oilfield Review, 26(3), 47.
John, L. & Robert, W. (1996). Gas Reservoir Engineering (Vol. 5). SPE Textbook Series.
Ministerio de Hidrocarburos. (2018). Secretaría de Hidrocarburos del Ecuador.
Monroy, B. & Pérez, J. (2017). Evaluación técnica y económica de los patrones de inyección de agua mediante la simulación analítica en cinco pozos del bloque v centro del campo Yariguí-Cantagallo mediante el software Sahara. Repositorio Digital Universidad de América. Bogotá, Colombia.
Paredes, L., Fonseca, C., David, M., Hensos, R., Withney, P., Jean Paule, L. & Ponce, G. (2017). An Alert-Based Monitoring System to Evaluate a Water Injection Pilot in the Shushufindi Field, Ecuador. SPE Latin America and Caribbean Mature Fields Symposium, Salvador, Bahia, Brazil, March. Doi: https://doi.org/10.2118/184947-MS
Paris de Ferrer, M. (2001). Inyección de agua y gas en yacimientos petrolíferos (Segunda ed.). Maracaibo, Venezuela: Ediciones Astro Data S.A.
Petroamazonas. (2017). Diagrama de un proceso de inyección de agua.
Petroamazonas EP. (2020). Departamento de Ingeniería Activo Shushufindi - Bloque 57
Sánchez, B. & Sánchez, D. (2021). Evaluación técnica - económica de los proyectos piloto de inyección de agua implementados en el yacimiento U inferior del campo Shushufindi, estaciones central y norte, durante el periodo 2019-2020. Quito: Universidad Central del Ecuador
Satter, A. & Thakur, G. (1994). Integrated Petroleum Reservoir Management. A Team Approach. P. P. Company, Ed. Tulsa Oklahoma: PennWell Books.
Vaca, J. (2020). Análisis técnico del proyecto piloto de inyección de agua implementado en el campo Shushufindi - Aguarico, reservorio U inferior, 10. Quito, Ecuador. Escuela Politécnica Nacional.